Incorrect cell link if drag sheet out to a new book


Version: 2026b SR1

Type: Bug Fixes

Category: Data Handling

Subcategory:

Jira: ORG-33942


  1. In Book1 Sheet1, fill it with data.

  2. Copy all data.

  3. Add a new sheet, paste link to A1.

  4. Drag Sheet2 out to be a new book.

  5. Check link address in any cell.
    ==> It shows cell://Sheet1!A[1], which should be cell://[Book1]Sheet1!A[1]

Issue existed since Origin 2026 and fixed in Origin 2026b SR1.