Origin File Exchange
Tripartite Plot
Tripartite Plot

Graph Template

3 Ratings

3 Comments

99 Downloads (90 Days)

Min.Version: 2025b (10.25) Updated on: 10/20/2025

A tripartite plot consists of 4 logarithmic scale axes, X, Y and two axes derived from X Y. The other two axes at 45 and 135 degrees to the X axis.\nSelect at least one pair of xy columns to create tripartite plot. Change unit with button on right-top corner.

Raincloud Plots
Raincloud Plots

Graph Template

3 Ratings

3 Comments

171 Downloads (90 Days)

Min.Version: 2021 (9.8) Updated on: 8/8/2025

Plot a horizontal violin plot that is half violin and half align-in-bin dot. It visualizes data distribution and probability density.\nAt least one column is required.

Box Width by Sample Size
Box Width by Sample Size

Graph Template

0 Ratings

0 Comments

107 Downloads (90 Days)

Min.Version: 2025b (10.25) Updated on: 8/5/2025

Plot box chart whose width is proportional to sample size with grouped data. \nSelect 1 Group column and at least 1 Y column in Group|Y order to create the plot. Multiple Y columns will create multiple graphs in same time.

Heatmap with Group
Heatmap with Group

Graph Template

0 Ratings

0 Comments

112 Downloads (90 Days)

Min.Version: 2025b (10.25) Updated on: 6/13/2025

Create a heatmap with manual grouping.\n A worksheet (virtual matrix) is required: The first column contains the X labels, the second column includes the X grouping information, the Y labels are in the ""Long Name"" label row, and the Y grouping information is in the ""Comments"" label row.

Wind Vectors Stick Diagram
Wind Vectors Stick Diagram

Graph Template

0 Ratings

0 Comments

41 Downloads (90 Days)

Min.Version: 2025 (10.2) Updated on: 12/11/2024

Select XYY columns to create the wind vectors stick diagram. The X column is the time series data, 1st Y represents the wind direction in degrees and 2nd Y represents the wind speed.

Circular Radar Chart
Circular Radar Chart

Graph Template

2 Ratings

2 Comments

235 Downloads (90 Days)

Min.Version: 2025 (10.2) Updated on: 11/15/2024

Select at least one column to create a radar chart with circular angular axis.

Wafer Map
Wafer Map

Graph Template

0 Ratings

0 Comments

61 Downloads (90 Days)

Min.Version: 2025 (10.2) Updated on: 11/15/2024

Select a matrix sheet to create wafer map.

Stacked Columns with Multiple Panels
Stacked Columns with Multiple Panels

Graph Template

1 Ratings

1 Comments

178 Downloads (90 Days)

Min.Version: 2025 (10.2) Updated on: 11/15/2024

Plot grouped data as stacked columns with multiple panels.\nSelect 3 or 4 columns in X|Y|Group|Color(optional) order to create plot. 3rd column is group info to define the panels.

3D Surface Map
3D Surface Map

Graph Template

4 Ratings

4 Comments

132 Downloads (90 Days)

Min.Version: 2025 (10.2) Updated on: 11/15/2024

Create surface for DEM or 2D image in 3D view\nDEM data in matrix or 2D image in image window are required.

Time Series Explorer
Time Series Explorer

Graph Template

1 Ratings

1 Comments

142 Downloads (90 Days)

Min.Version: 2024b (10.15) Updated on: 11/15/2024

Select at least one Y column to create line plot with Zoom ROI. X could be date or time column. Switch to appropriate range with Range button, move ROI or use button to explore time series data.

XRD with PDF
XRD with PDF

Graph Template

9 Ratings

9 Comments

291 Downloads (90 Days)

Min.Version: 2023 (10.0) Updated on: 11/15/2024

A graph to display X-ray diffraction (XRD) and corresponding PDF standard pattern\nPut the XRD data as XY columns in the 1st sheet and PDF data as XY columns in the 2nd sheet

XPS Area
XPS Area

Graph Template

9 Ratings

9 Comments

123 Downloads (90 Days)

Min.Version: 2022 (9.9) Updated on: 11/15/2024

Create a area graph for XPS peaks. \nData should be arranged in columns with order as BE, Raw, Sum, BG, Peak1, Peak2 ect..

Triangle Heatmap
Triangle Heatmap

Graph Template

3 Ratings

3 Comments

155 Downloads (90 Days)

Min.Version: 2021 (9.8) Updated on: 11/15/2024

Plot a lower triangular heatmap with Z values as labels.\nA virtual matrix or matrix is required.

Cluster Plot with Confidence Ellipse
Cluster Plot with Confidence Ellipse

Graph Template

22 Ratings

22 Comments

236 Downloads (90 Days)

Min.Version: 2022 (9.9) Updated on: 11/15/2024

Create cluster plot with confidence ellipse. \nSelect XYY to create graph, 2nd Y is grouping info

Colormap Sunburst
Colormap Sunburst

Graph Template

0 Ratings

0 Comments

124 Downloads (90 Days)

Min.Version: 2022 (9.9) Updated on: 11/15/2024

Create colormap sunburst chart. Color of the wedges is mapped to their value.\nAt least 3 columns are required: The last column should be data values(Set as Y) and all other columns are categories and sub-categories(Set as X)

Ternary Density Dots
Ternary Density Dots

Graph Template

0 Ratings

0 Comments

79 Downloads (90 Days)

Min.Version: 2023 (10.0) Updated on: 11/15/2024

Density dots in ternary coordinates. \nSelect one set of XYZ columns to create the graph

Correlation Chord Diagram
Correlation Chord Diagram

Graph Template

4 Ratings

4 Comments

156 Downloads (90 Days)

Min.Version: 2023 (10.0) Updated on: 11/15/2024

Chord diagram for correlationship \nSelect multiple columns and visualize the correlation between them with chord diagram

Speedometer Chart
Speedometer Chart

Graph Template

0 Ratings

0 Comments

59 Downloads (90 Days)

Min.Version: 2022b (9.95) Updated on: 11/15/2024

Create speedometer/gauge chart.\n3 columns are required, 1st and 2nd column are levels and percentage for the speedometer, 3rd column is the value of the pointer

Energy Diagram
Energy Diagram

Graph Template

6 Ratings

6 Comments

132 Downloads (90 Days)

Min.Version: 2022b (9.95) Updated on: 11/15/2024

Create a simple energy diagram.\n2 columns (XY) are required. The 3rd column is optional, which will be used as label

Gantt Chart
Gantt Chart

Graph Template

0 Ratings

0 Comments

143 Downloads (90 Days)

Min.Version: 2022b (9.95) Updated on: 11/15/2024

Create a Gantt Chart.\n4 columns are required. The first 2 columns are category and item, respectively. The last 2 columns are beginning and end date, so they must be set in Date type properly

Variable Bin Width Histogram
Variable Bin Width Histogram

Graph Template

1 Ratings

1 Comments

71 Downloads (90 Days)

Min.Version: 2022b (9.95) Updated on: 11/15/2024

Create histogram with varying bin width\n2columns are required, 1st column is raw data of the histogram, 2nd column is the bin boundaries

Corner Difference Histogram
Corner Difference Histogram

Graph Template

0 Ratings

0 Comments

67 Downloads (90 Days)

Min.Version: 2021b (9.85) Updated on: 11/15/2024

Corner Difference Histogram compares difference of two variables in different groups.\nSelect XY column to plot and 3rd column is categorical column.

Double-Z 3D Bars
Double-Z 3D Bars

Graph Template

3 Ratings

3 Comments

106 Downloads (90 Days)

Min.Version: 2023b (10.05) Updated on: 11/15/2024

Select at least two Z columns to create XYZ 3D side-by-side stacked bars with two different Z axis. Left/right axis assignment info. put in the Comment label row

Double-Y Waterfall
Double-Y Waterfall

Graph Template

2 Ratings

2 Comments

160 Downloads (90 Days)

Min.Version: 2023b (10.05) Updated on: 11/15/2024

Select at least two Y columns to create waterfall with two different Y axis. Left/right axis assignment info put in the Comment label row

Bar with Stick
Bar with Stick

Graph Template

0 Ratings

0 Comments

48 Downloads (90 Days)

Min.Version: 2023b (10.05) Updated on: 11/15/2024

Select at least one column to create bar plot with stick at all data points

Grouped 3D Stacked Bars
Grouped 3D Stacked Bars

Graph Template

2 Ratings

2 Comments

112 Downloads (90 Days)

Min.Version: 2023b (10.05) Updated on: 11/15/2024

Plot grouped data as side-by-side 3D stacked bars. XYZZZZ columns are required. Group info puts in Comment label row

3D Stacked Line&Symbol
3D Stacked Line&Symbol

Graph Template

4 Ratings

4 Comments

133 Downloads (90 Days)

Min.Version: 2023b (10.05) Updated on: 11/15/2024

Plot line and symbol plots on stacked 3D planes. At least one Y columns are required. Put the Z values, which define the position of the lines, in Comments label row

Split Violin with Separate Interval
Split Violin with Separate Interval

Graph Template

1 Ratings

1 Comments

74 Downloads (90 Days)

Min.Version: 2023 (10.0) Updated on: 11/15/2024

Split violin plot with separate confidence interval\nSelect at least two columns. Last column needs to contan 2 categorices only.

Contour without Contour Lines
Contour without Contour Lines

Graph Template

3 Ratings

3 Comments

164 Downloads (90 Days)

Min.Version: 2022b (9.95) Updated on: 11/15/2024

Plot a contour plot without contour lines.\nXYZ columns are required

Box Style with Lighter Fill
Box Style with Lighter Fill

Graph Template

2 Ratings

2 Comments

110 Downloads (90 Days)

Min.Version: 2021 (9.8) Updated on: 11/15/2024

Select at least one Y column to create box plot.\nThis graph will use same color scheme for border and fill. Fill is lighter than border.

Log-log Plot
Log-log Plot

Graph Template

0 Ratings

0 Comments

62 Downloads (90 Days)

Min.Version: 2021 (9.8) Updated on: 11/14/2024

Plot line graph with Log-Log axis scale.\nAt least one Y column is required.

Ternary Phase Diagram
Ternary Phase Diagram

Graph Template

1 Ratings

1 Comments

81 Downloads (90 Days)

Min.Version: 2022b (9.95) Updated on: 11/14/2024

Ternary phase diagram is popular in materials science community. In this coordinate, Y and Z axes are both start at zero in same corner(X).\nPlot with XYZ data columns.

Y-Shared Double-X Plot
Y-Shared Double-X Plot

Graph Template

2 Ratings

2 Comments

121 Downloads (90 Days)

Min.Version: 2023 (10.0) Updated on: 11/14/2024

Plot one line and symbol plot with X1 in bottom axis and X2 in top axis.\nSelect XXY columns to create Y-shared double-x plot.

Plots from multiple-X-one-Y Data
Plots from multiple-X-one-Y Data

Graph Template

6 Ratings

6 Comments

141 Downloads (90 Days)

Min.Version: 2023b (10.05) Updated on: 11/14/2024

Select XXXXY or YXXXX columns to create a line+symbol graph

Histogram with Range X Tick Labels
Histogram with Range X Tick Labels

Graph Template

0 Ratings

0 Comments

62 Downloads (90 Days)

Min.Version: 2023b (10.05) Updated on: 11/14/2024

Select one column to create histogram with range x tick labels. \nClick green lock and select Change Parameter to specify bin settings once the graph is created.

Periodic Table
Periodic Table

Graph Template

3 Ratings

3 Comments

103 Downloads (90 Days)

Min.Version: 2024 (10.1) Updated on: 11/14/2024

Generate periodic table with color map to element values. \nSelect any column(s) in the worksheet to generated periodic table

Polar Heatmap
Polar Heatmap

Graph Template

5 Ratings

5 Comments

131 Downloads (90 Days)

Min.Version: 2024 (10.1) Updated on: 11/14/2024

Create polar heatmap from data in worksheet\n Virtual Matrix is required: a worksheet with X values in the first column, Y values in Long Name, and rest of data cells are Z values

X-Offset Scatter Plot
X-Offset Scatter Plot

Graph Template

0 Ratings

0 Comments

73 Downloads (90 Days)

Min.Version: 2024 (10.1) Updated on: 11/14/2024

Create scatter plot as side-by-side data points if they have the same X values. \nXYYY or XYYerrYErr columns are required.

Raised Relief Map
Raised Relief Map

Graph Template

3 Ratings

3 Comments

13 Downloads (90 Days)

Min.Version: 2023 (10.0) Updated on: 11/14/2024

Create Raised Relief Map

100% Stacked Bar Map
100% Stacked Bar Map

Graph Template

1 Ratings

1 Comments

54 Downloads (90 Days)

Min.Version: 2023b (10.05) Updated on: 11/14/2024

Select X, plus at least 3 Y columns to create 100% Stacked Bar Map, XY coordinates determine location of each 100% stacked bar

Sparkline Chart
Sparkline Chart

Graph Template

0 Ratings

0 Comments

51 Downloads (90 Days)

Min.Version: 2023b (10.05) Updated on: 11/14/2024

Select at least one Y columns to create line plot with dots on both ends

Stacked Bar Map
Stacked Bar Map

Graph Template

0 Ratings

0 Comments

55 Downloads (90 Days)

Min.Version: 2023b (10.05) Updated on: 11/14/2024

Select X, plus at least 3 Y columns to create Stacked Bar Map, XY coordinates determine location of each stacked bar.

Panels with multiple-X-one-Y Data
Panels with multiple-X-one-Y Data

Graph Template

0 Ratings

0 Comments

92 Downloads (90 Days)

Min.Version: 2023b (10.05) Updated on: 11/14/2024

Select XXXXY or YXXXX columns to create a multi-panel graph. Plot each XY in its own panel.

Bridge Charts in Multiple Panels
Bridge Charts in Multiple Panels

Graph Template

0 Ratings

0 Comments

50 Downloads (90 Days)

Min.Version: 2023 (10.0) Updated on: 11/14/2024

Create bridge charts to visualize the data change from raw data. \nSelect X and at least two Y columns to create bridge chart in multiple panels

Pie Chart from Categorical Data
Pie Chart from Categorical Data

Graph Template

1 Ratings

1 Comments

56 Downloads (90 Days)

Min.Version: 2023 (10.0) Updated on: 11/14/2024

Create pie chart from categorical data. \nSelect one column with categorical data to create the graph.

Radial Bubble
Radial Bubble

Graph Template

0 Ratings

0 Comments

83 Downloads (90 Days)

Min.Version: 2023 (10.0) Updated on: 11/14/2024

Radial bubble represents data by scatter size and color.\nVirtual Matrix is required: a worksheet with X values in the first column, Y values in Long Name, and rest of data cells are Z values deciding the bubble size and color.

XPS Line
XPS Line

Graph Template

1 Ratings

1 Comments

162 Downloads (90 Days)

Min.Version: 2021 (9.8) Updated on: 11/14/2024

Create a line graph for XPS peaks. \nData should be arranged in columns with order as BE, Raw, Sum, BG, Peak1, Peak2 ect..

Colormap Filled Waterfall
Colormap Filled Waterfall

Graph Template

4 Ratings

4 Comments

117 Downloads (90 Days)

Min.Version: 2021 (9.8) Updated on: 11/14/2024

Select at least 2 Y columns to plot waterfall plots with fill color mapping to Y value.

Waterfall with Inset
Waterfall with Inset

Graph Template

2 Ratings

2 Comments

136 Downloads (90 Days)

Min.Version: 2021 (9.8) Updated on: 11/14/2024

Create a waterfall graph with inset plot. \nInset graph line connects maximum of each curve in waterfall. XYYYY columns are required.

Scatter with Smoothed Lines
Scatter with Smoothed Lines

Graph Template

1 Ratings

1 Comments

161 Downloads (90 Days)

Min.Version: 2021 (9.8) Updated on: 11/14/2024

Plot a scatter plot connected with smoothed lines.\nAt least one Y column is required.

Refine by Type

Refine by Category








Min. Origin Version